GDANSK BULK TERMINAL PORT

— Conveying

GDANSK BULK TERMINAL PORT

Interactively procrastinate high payoff content without backward.

Client:
GDANSK BULK TERMINAL PORT
Role:
Intake, Storage, Transport and Drying
Tools Used:
Intake system, storage, transport, drying
Year:
2013
Role:
This is some text inside of a div block.
Tools Used:
This is some text inside of a div block.
Year:
This is some text inside of a div block.
Service Rendered:
This is some text inside of a div block.

This modern and fully automated terminal is located in the Port of Gdansk and has a total storage capacity of 36.000 tonnes. The terminal primarily handles export of grain and feedstuffs as well as import of malting barley, feedstuff and biomass product. In addition to storage the facility holds a grain dryer with a drying capacity of 45 t/h with pre-cleaning at 150 t/h. “The installation started in 2012 and has just been completed with an opening in June 2013. We have through the design as well as the manufacturing and installation phase worked in closed cooperation with the team in Gdansk to ensure the best possible solution” project manager Michael Issack-Larsen explains.

Details

Details on Lachenmeier Monsun supplies:

Intake system: Two truck intakes, each 150 t/h Ship intake 200 t/h

Filling of silos:

Conveying capacity 170 t/h

Discharge of silos: Conveying capacity 300 t/h

Filling of flat stores:

Conveying capacity 300 t/h

Discharge of flat store:

Conveying capacity 300 t/h

Storage system:

Flat storages in three sections totalling 19.000 tonnes.

Five silos, each 3.400 t totalling 17.000 tonnes.

Loading/Unloading: Ship loading 450 t/h

Truck loading 180 t/h

Ship unloading 200 t/h

Truck unloading 2 x 150 t/h

Dryer: Capacity of 45 t/h with pre-cleaning at 150 t/h.

Complete design, manufacturing, supply - and installation work.