— Conveying
GDANSK BULK TERMINAL PORT
Interactively procrastinate high payoff content without backward.
Client:
GDANSK BULK TERMINAL PORT
Role:
Intake, Storage, Transport and Drying
Tools Used:
Intake system, storage, transport, drying
Year:
2013
Role:
This is some text inside of a div block.
Tools Used:
This is some text inside of a div block.
Year:
This is some text inside of a div block.
Service Rendered:
This is some text inside of a div block.
Details
Details on Lachenmeier Monsun supplies:
Intake system: Two truck intakes, each 150 t/h Ship intake 200 t/h
Filling of silos:
Conveying capacity 170 t/h
Discharge of silos: Conveying capacity 300 t/h
Filling of flat stores:
Conveying capacity 300 t/h
Discharge of flat store:
Conveying capacity 300 t/h
Storage system:
Flat storages in three sections totalling 19.000 tonnes.
Five silos, each 3.400 t totalling 17.000 tonnes.
Loading/Unloading: Ship loading 450 t/h
Truck loading 180 t/h
Ship unloading 200 t/h
Truck unloading 2 x 150 t/h
Dryer: Capacity of 45 t/h with pre-cleaning at 150 t/h.
Complete design, manufacturing, supply - and installation work.